Navigation
๐Ÿ  Overview
๐Ÿ“ My Projects 2
๐Ÿ“… Timeline & Milestones
๐Ÿ“„ Documents 3
โœ… Compliance Status
๐Ÿ’ฌ Messages 2
โž• Request a Service
Your EAP Team
SSK Consulting
Lead EAP
SSK Consulting Team
EAPASA Registered Practitioner
WhatsApp EAP

Good morning, Client

Here’s a summary of your active projects and upcoming deadlines.

Active Projects
2
Currently in progress
Pending Actions
3
Require your input
Documents Ready
5
Available for download
Next Deadline
14
Days โ€” comment period closes
Active Projects
Riverside Solar Energy Facility โ€” Basic Assessment
๐Ÿ“ Limpopo Province โšก Energy & Infrastructure ๐Ÿ“… Started: Jan 2026
Public Participation Phase 62% Complete
Active
Thornfield Agricultural Development โ€” Water Use Licence
๐Ÿ“ Mpumalanga ๐ŸŒพ Agriculture ๐Ÿ“… Started: Mar 2026
Technical Studies Phase 25% Complete
In Progress
Upcoming Deadlines
02
Jun
Draft BAR Comment Period Closes
Riverside Solar โ€” public comments due
14 days
15
Jun
Hydrological Study Submission
Thornfield WUL โ€” DWS requirement
27 days
30
Jul
Final BAR Submission to MEC
Riverside Solar โ€” competent authority
72 days
Recent Messages
SK
SSK Consulting Team Today, 09:14
The draft Basic Assessment Report for the Riverside Solar project is ready for your review. Please download from the Documents section and provide comments by 2 June 2026.
SK
SSK Consulting Team Yesterday
The ecological specialist study for Riverside Solar is complete. No critically endangered species were recorded on site โ€” this is good news for your timeline.

Project Timeline

Riverside Solar Energy Facility โ€” Basic Assessment Process

EIA Process Milestones โ€” NEMA EIA Regulations 2014
โœ“
EAP Appointed & Application Submitted
15 January 2026 โ€” Completed
SSK Consulting appointed as EAP. Application submitted to Limpopo Department of Economic Development, Environment and Tourism (LEDET). Registration confirmed.
โœ“
Background Information Document (BID) Issued
28 January 2026 โ€” Completed
BID distributed to all registered I&APs. Notifications placed in local newspapers and on site. 30-day comment period opened.
โœ“
Site Visit & Specialist Studies
Febโ€“Mar 2026 โ€” Completed
Ecological assessment (no critically endangered species), heritage impact assessment (no significant sites), visual impact assessment and agricultural potential study all completed.
โ—
Draft Basic Assessment Report โ€” Public Review
19 May 2026 โ€” IN PROGRESS (30-day comment period)
Draft BAR distributed to all I&APs for comment. Comment period closes 2 June 2026. Client review also requested โ€” please download from Documents and provide any feedback by 2 June.
โ—‹
Response to Comments & Final BAR
Est. June 2026
SSK to compile all comments received, prepare response to comments document and finalise the Basic Assessment Report for submission to LEDET.
โ—‹
Final BAR Submitted to Competent Authority
Est. 30 July 2026
Final BAR submitted to LEDET. 107-day statutory decision period commences. SSK will follow up regularly with the authority.
โ—‹
Environmental Authorisation Issued
Est. November 2026
LEDET issues Environmental Authorisation. SSK to review conditions and advise on compliance obligations. Project may commence construction subject to EA conditions.

Project Documents

All documents related to your active projects. Click to download.

Riverside Solar Energy Facility
๐Ÿ“„
Draft Basic Assessment Report (DBAR)
Uploaded 19 May 2026 ยท PDF ยท 4.2 MB ยท Please review and comment by 2 June 2026
Draft โ€” Review Required
๐ŸŒฟ
Ecological Impact Assessment โ€” Final Report
Uploaded 12 April 2026 ยท PDF ยท 8.7 MB ยท Compiled by registered ecologist
Final
๐Ÿ›๏ธ
Heritage Impact Assessment โ€” Final Report
Uploaded 5 April 2026 ยท PDF ยท 3.1 MB ยท SAHRA Phase 1 & 2 complete
Final
๐Ÿ“‹
Background Information Document (BID)
Uploaded 28 January 2026 ยท PDF ยท 1.8 MB
Final
Thornfield Agricultural Development โ€” WUL
๐Ÿ’ง
Water Use Licence Application โ€” Form WR55
Uploaded 2 March 2026 ยท PDF ยท 2.4 MB ยท Submitted to DWS
Submitted
๐Ÿ“Š
Hydrological Study โ€” Draft
In progress ยท Expected upload: 10 June 2026 ยท Registered geohydrologist
In Progress

Compliance Status

Your current environmental authorisation and compliance obligations.

Environmental Authorisations
โšก
Riverside Solar โ€” Basic Assessment EA
Application in progress โ€” LEDET Limpopo
In Progress
๐Ÿ’ง
Thornfield โ€” Water Use Licence (NWA)
Application submitted โ€” DWS Mpumalanga
Pending DWS
Compliance Obligations
๐Ÿ“‹
EA Conditions Monitoring Report
Previous project โ€” Due: 30 June 2026
Due Soon
๐ŸŒฟ
Annual Ecological Monitoring
Previous project โ€” Completed Feb 2026
Complete
๐Ÿ’จ
Atmospheric Emission Licence Renewal
Not applicable โ€” no scheduled processes
N/A

Messages & Updates

Direct communication with your SSK Consulting EAP team.

SK
SSK Consulting Team Today, 09:14
The draft Basic Assessment Report for the Riverside Solar project is now available for your review in the Documents section. The report covers all specialist study findings, impact assessment and mitigation measures. Please review and send any comments by 2 June 2026 โ€” this is the statutory deadline for the public comment period.
SK
SSK Consulting Team Yesterday, 14:32
The ecological specialist study for Riverside Solar is complete. No critically endangered species were recorded on site during the field survey. The ecologist did note the presence of an Endangered grassland patch in the north-eastern corner โ€” we’ve adjusted the project layout to avoid this area entirely. This is very good news for your timeline and approval prospects.
SK
SSK Consulting Team 12 May 2026
We have successfully registered 47 Interested and Affected Parties (I&APs) for the Riverside Solar project. This includes the local municipality, neighbouring landowners, community representatives and relevant government departments. The Draft BAR will be distributed to all registered I&APs simultaneously when it’s ready.
SK
SSK Consulting Team 2 March 2026
Your Water Use Licence application for the Thornfield project has been submitted to the Department of Water and Sanitation (DWS) Mpumalanga regional office. Reference number: DWS/MP/2026/0847. The statutory processing period is 300 days. We will follow up with DWS monthly and update you on any developments.
Send a Message to SSK

My Projects

All your active and completed projects with SSK Consulting.

Riverside Solar Energy Facility โ€” Basic Assessment
๐Ÿ“ Limpopo Province โšก Energy ๐Ÿ“… Jan 2026 โ€“ Est. Nov 2026 ๐Ÿ“‹ LN1 Activity 4 โ€” Basic Assessment
Public Participation Phase62%
Active
Thornfield Agricultural Development โ€” Water Use Licence
๐Ÿ“ Mpumalanga ๐ŸŒพ Agriculture ๐Ÿ“… Mar 2026 โ€“ Est. Jan 2027 ๐Ÿ’ง NWA Section 21(a)(f) WUL
Technical Studies Phase25%
In Progress
Sandton Commercial Development โ€” Environmental Compliance Audit
๐Ÿ“ Gauteng ๐Ÿ—๏ธ Construction ๐Ÿ“… Completed: Dec 2025
Complete

Request a Service

Add a new service to your existing project or start a new engagement with SSK Consulting.

๐Ÿ“‹
New EIA / Basic Assessment
Start a new environmental impact assessment for a new project or activity
๐Ÿ’ง
Water Use Licence
New WUL application or amendment to existing water use authorisation
โœ…
Compliance Audit
Independent audit of your EA conditions, monitoring obligations and regulatory compliance
๐ŸŒฑ
GHG Inventory
Formal Scope 1, 2 & 3 greenhouse gas inventory aligned with the GHG Protocol
๐Ÿ“Š
ESG Advisory
ESG strategy, JSE disclosure support, GRI reporting and sustainability programme development
๐Ÿš
Drone Survey
Aerial photography, orthophoto mapping, DEM and 3D modelling for your project site
๐Ÿฆ‹
Biodiversity Assessment
Ecological surveys, NEMBA threatened species assessment and biodiversity offset calculation
๐ŸŒก๏ธ
Climate Risk Assessment
TCFD-aligned physical and transition climate risk assessment for green finance and JSE disclosure
๐Ÿ›๏ธ
Heritage Assessment
Phase 1 & 2 heritage impact assessment under the National Heritage Resources Act
Need something not listed above?
Contact your EAP team directly โ€” we handle all environmental, agricultural and GIS consulting needs.
WhatsApp SSK โ†’